Overview

Before actual commissioning of the transformer at the site, the transformer has to go through some other tests, performed on it. These tests are called the pre-commissioning tests of the transformer. They are carried out to assess the condition of the transformer after installation and compare the test results of all the low voltage tests with the factory test reports.

We provide on site pre commissioning tests facility which are performed by our qualified team.